The scope of works for the proposed contracts includes:
1) UK 2221: studies, supply, qualification, manufacturing, and associated controls, delivery, erection, commissioning and on-site testing for 2 equipment hatches for 2 units at Hinkley point new nuclear power plant (twin-reactor site)
2) PE 2221: studies, supply, qualification, manufacturing, and associated controls, delivery, erection, commissioning and on-site testing for 1 equipment hatch for Penly 3 new nuclear power plant (single reactor site)
The equipment hatch is lined with a steel sleeve, which is closed by a large removable metallic cap, and fitted inside of the internal HR containment. It allows accesses of heavy pieces of equipment during construction stages.
Total quantity or scope
1) UK 2221
— Hinkley point nuclear power plant: 2 firm units: 2 equipment hatches,
— Option 1: other nuclear power plant in the UK: 1 optional unit,
— Option 2: other nuclear power plant in the UK: 1 optional unit in the same site as option 1 or in a third site.
2) PE 2221:
PENLY 3 nuclear power plant 1 firm equipment hatch.
Contact:
EDF SA – Acting in its own name and in the name and on behalf of its affiliated companies
20, place de la Défense
Contact: Agence Achats Ingénierie CNEN
Attn: Tony Gout – Karim Bachri
92050 Paris La Défense Cedex
FRANCE
Tel. +33 177491194
E-mail: tony-f.gout@edf.fr
Address of the buyer profile http://portail-achats.edf.com
Application language: English and French
Supply contract – 44597-2011