Sequence of Project WAGR activities

Campaign 1 Controlled manual activity to prepare the top of the hot box for remote operations
Campaign 2 Removal of operational waste from the fuel channels
Campaign 3 Dismantling of the hot box
Campaign 4 Removal of the loop tubes
Campaign 5 Dismantling of the neutron shield
Campaign 6 Removal of the graphite core and steel restraint structure
Campaign 7 Dismantling of the thermal shield
Campaign 8 Size reduction and removal of the lower structures (diagrid and tundish)
Campaign 9 Size reduction and removal of the pressure vessel and insulation
Campaign 10 Size reduction and removal of the outer ventilation membrane and experimental thermal columns. Final clean out of the reactor bioshield