Table 2: Hydrogen supply options

Remote SMR with pipeline distribution Remote SMR with truck distribution Local SMRs
Unit production size (t/d) 10 10 1
SMR capital cost ($ million) One at 18 One at 18 Ten at 4
Storage capital ($ million) Ten at 0.2 Ten at 0.4 Ten at 0.2
Production and storage capital ($ million) 20 22 42
Capital charge ($ million/y) 4.0 4.4 8.4
Capital charge ($/t) 1096 1206 2302
Energy cost ($/t) 1036 1036 1036
Distribution cost ($/t) 1887 837 0
Carbon charge ($/t) 227 227 227
Total ($/t) 4246 3306 3565