Table 1: Phases in the use of nuclear energy and the management of high level waste
Phase
Approximate time frame
Relevant activity during the phase
1
2000-2050
• Use of nuclear power continues.
• Reprocessing of irradiated fuel continues; plutonium stockpiled.
• Design and costing of long-term MRSS facilities carried out.
• R&D into alternative methods for fuel disposal continues.
• Ring-fenced fund established to meet net costs for management of phase 1 high level waste and storage of plutonium.
2
2050-2100
• Possible temporary pause in the use of nuclear power.
• Reprocessing of backlog of irradiated fuel continues.
• Construction and commissioning of long-term MRSS facilities begins.
3
End of phase 2 until 2300
• Nuclear energy re-introduced for power generation and replacement of nuclear heat, using stockpiled plutonium in breeder, or near-breeder reactors. energy by a Reprocessing of irradiated fuel continues, to provide a better alternative. sustainable energy source.
• Development and commissioning of final disposal facilities.