Table 2. Units that have not yet operated for 1 year as at end December 2000
Reactor Country Rank Load Avail% Rank Load MWh(gr.) MWe Type First
Factor % Factor % generated gross power
Chooz B 1 F 87.4 8740257 1516 P 05/01
Angra 2 BR 49.1 2622652 1309 P 07/01
Chooz B 2 F 91.9 3075838 1516 P 09/01
Kaiga 1 IN 90.6 230000 235 P 11/01
Rajasthan 3 IN 79.0 767142 220 H 11/01
Reactor type abbreviations: P=PWR, B=BWR, H=Heavy water (pressurised), M=Magnox, A=AGR, R=RBMK, F=Fast Reactor
Ranking: Load factors are only shown in the table to one place of decimals, but ranking is on the basis of three places of decimals