Keeping OL1 up on top with upgrades
-
Waterways were also inspected and repaired during the latest outage at the... -
Inspecting a steam blow out well inside the containment vessel -
This service shaft leads to areas beneath the RPV -
Improvements are systematic at OL1 and 2 -
Decisions on repair or replacement for key components depends on a range of... -
The steam turbine at OL1 has also seen upgrades to the low- pressure section