Refurbishing a contaminated nuclear casing
-
The original rings were installed during as-found inspection to develop the... -
Hydro’s engineers measured flatness during the inspection using precision... -
The pump was assembled with the mock-up rings to verify proper fit up -
The casing after being completed and machined; ready for shipment