Slowing down expectations
-
Figure 5: Thermal reprocessing capacity (base case) -
Figure 4: Installed capacity of reactors with recycling technologies (MOX FR)... -
Figure 3: LWR-UO2 installed capacity for the base growth case of 2.5% per year -
Figure 2: Fast reactor fuel recycling scheme -
Figure 6: Fast recycling capacity for the base case of 2.5% growth -
Figure 1: Once-through fuel cycle scheme